Find a project like mine
Compare two completed service-riser projects by site conditions, what Vital supplied and what you can see in the published case studies.
Compare platform and walkway projects
Princess Alexandra Hospital
- Site conditions
- A retrofit around closely spaced existing cables and equipment.
- Supplied scope
- Open-mesh panels fitted around existing routes, with a contrasting yellow threshold.
- Published evidence
- The case study shows the threshold and finished fit around existing services.
Warwick University
- Site conditions
- A compact service riser with a doorway and service penetrations to accommodate.
- Supplied scope
- Fitted green open-mesh flooring and a dark entrance strip.
- Published evidence
- The entrance photograph shows the transition and the finish around penetrations.
University College London
- Site conditions
- A narrow riser with existing services and a ladder opening to coordinate.
- Supplied scope
- Permanent open-mesh flooring and a fixed ladder, with attention to the stepping-off point.
- Published evidence
- The case study shows the floor and ladder together in the confined space.
Aire Park
- Site conditions
- A marked scope for the supply and installation of service-riser flooring.
- Supplied scope
- Open-mesh flooring, a support profile grid and fixings.
- Published evidence
- The case study shows the support framework and records the O&M information and drawing register.
One Nine Elms
- Site conditions
- A dense service layout within the riser.
- Supplied scope
- Panelised permanent flooring on support profiles.
- Published evidence
- Published photographs taken from below show the panel and support arrangement.
Thomas Sinden, Bromley High Street
- Site conditions
- A residential build needed ten riser floors across five levels, with supports fixed into concrete.
- Supplied scope
- Design and installation of yellow open-mesh GRP grating and supports across the ten riser openings.
- Published evidence
- The case study shows the installed floors and the supports viewed from below.
University of Southampton
- Site conditions
- Service routes, trimmer positions and the installation sequence had to be coordinated with Kier.
- Supplied scope
- GRP riser-floor access with framework within the areas identified in the installation records.
- Published evidence
- A signed record lists five risers installed with framework. A separate signed South Block record covers mechanical riser 1 on levels 1 to 4.