Compare platform and walkway projects
Compare two GRP access projects by site conditions, supplied scope and the evidence published in each case study.
Compare service-riser projects
Old Leake STW
- Site conditions
- Raised working access was needed beside existing treatment equipment at a sewage treatment works.
- Supplied scope
- Integrated platform and stair, with handrails, toe boards and a braced support frame.
- Published evidence
- The completed installation is photographed. The project record describes survey, drawing coordination, structural input and site delivery.
SUEZ Southend
- Site conditions
- A waste and recycling facility needed several different access structures in a compressed programme.
- Supplied scope
- Five mobile platforms, four fixed platforms and four stair assemblies fabricated and dispatched as one package.
- Published evidence
- The case study documents fabrication and dispatch, with photographs and a short film of the actual structures.
Dornan data-centre HVAC access
- Site conditions
- Dense plant, door thresholds and changes in ground level affected a connected access route.
- Supplied scope
- Coordinated GRP steps, platforms, ramps and guarding across equipment zones. Assemblies were delivered flat packed and installed on site.
- Published evidence
- The case study shows the installed routes and describes fabrication drawings, structural calculations and O&M information.
British Sugar Wissington
- Site conditions
- Maintenance access had to work around industrial process equipment and restricted clearances.
- Supplied scope
- The installed arrangement combines open-mesh flooring, structural profiles, handrails and a level-change access point.
- Published evidence
- Published site photographs show the platform fitted around the existing plant.
Well-Safe Guardian
- Site conditions
- An offshore installation needed to address corrosion, installed mass and project-specific fire-performance requirements.
- Supplied scope
- A coordinated multi-level phenolic GRP system comprising platforms, walkways, stairs, ladders and handrails.
- Published evidence
- The published case shows the installed arrangement and records site inspection, design, fabrication and installation.
Mamsha Al Mugheirah
- Site conditions
- A visitor boardwalk in a mangrove setting had to account for saline water, strong sunlight and appearance.
- Supplied scope
- GRP grating and profiles specified together with vinylester resin, UV inhibitors and a wood-toned finish.
- Published evidence
- Published photographs and a short film show the completed boardwalk in its setting.