+44 (0)1206 396446 Call +44 (0)1206 396446

Vital GRP project case study

Well-Safe Guardian Phenolic GRP Access Platforms

A multi-level phenolic GRP access system designed to reduce weight, corrosion exposure and maintenance offshore.

Oil, gas and offshorePhenolic platforms, stairs, ladders and handrails
Phenolic GRP walkway installed around offshore rescue equipment.
Phenolic GRP walkway installed around offshore rescue equipment.
SectorOil, gas and offshore
LocationWell-Safe Guardian semi-submersible unit
SystemPhenolic platforms, stairs, ladders and handrails
ClientWell-Safe Solutions

Project sheet: download the illustrated project case study.

Download PDF case study

01 · Challenge

Control weight and corrosion offshore.

The Earl & Wright 700 Series midwater semi-submersible operates in a marine environment shaped by saltwater, humidity, heavy use and strict fire-performance expectations. Existing steel access components brought recurring corrosion, slippery surfaces and a substantial maintenance burden.

The replacement strategy also had to control installed weight. Following site inspection, phenolic GRP grating and structural profiles were selected for a multi-level access package comprising walkways, platforms, handrails, ladders and stairs.

02 · Specification

Phenolic GRP within a coordinated access system.

Phenolic specification

The project account records phenolic components for its fire-performance requirements. The exact product evidence and its scope must match the specified offshore assembly.

Integrated access

Platforms, walkways, stairs, ladders and handrails were designed as one coordinated multi-level system.

Lower installed mass

The Vital case book reports a 50% weight reduction. The comparison basis and calculation are not reproduced in that account.

Multi-level phenolic GRP access structure on the Well-Safe Guardian.
Multi-level phenolic GRP access structure on the Well-Safe Guardian.

03 · Delivery

Survey, design, fabrication and installation.

The delivery team developed the multi-level access arrangement following site inspection. The project account records design, fabrication and installation of the system. Anti-slip surfaces and corrosion-resistant components addressed day-to-day offshore use while phenolic material selection responded to the recorded fire-performance requirement.

Phenolic GRP stairs and structural framing in the offshore access system.
Phenolic GRP stairs and structural framing in the offshore access system.

04 · Outcome

Project-specific results and technical evidence.

The project record reports a 50% weight reduction and a client saving of $300,000, alongside a safer and lower-maintenance access arrangement.

Source: Vital Case Studies, marketing case book, Well-Safe Solutions project account. The reported savings and weight reduction are project-specific; the calculation basis is not reproduced.
Technical evidence: The account references BS 476 and ASTM E84 without identifying a BS 476 part, classification or test report. Request the exact product evidence against the asset requirements and proposed assembly. This case study is not a product certificate or marine approval.

Installed GRP stair and handrail detail on the semi-submersible unit.
Installed GRP stair and handrail detail on the semi-submersible unit.

Planning a similar project?

Planning a lighter offshore access system?

Weight, exposure and fire-performance requirements affect the material choice and the complete assembly.

Start with the asset, access duty, exposure and fire-performance requirements. We can help define the assembly and the supporting product evidence.

Discuss an offshore access project

Technical project enquiry

Send the drawings.Show us the constraint.

Share whatever is available. A finished specification is not required; photographs, marked-up PDFs and partial dimensions can all help us identify the next responsible step.

  • Up to five drawings or photographs
  • Project and technical enquiries
  • Reviewed by the Vital GRP team

Tell us what you know

← Back

Thank you. Your enquiry has been received.

The Vital GRP team will review the information you have sent and contact you about the next step. For a time-critical requirement, call 01206 396446. Keep a copy of your drawings and brief for reference. There is no need to send the same enquiry again. If you need to add anything, please contact the team and mention your project.

Drag and drop or click to select up to 5 files, maximum 20 MB per file. Use PDF drawings, JPG or PNG photographs, or Word documents. For DWG, IFC or larger files, contact the team to agree a transfer method. You can send an enquiry without attachments.

Your files are used to review and respond to this enquiry. Open the full contact page.