+44 (0)1206 396446 Call +44 (0)1206 396446

Products & Systems →

GRP fencing • gates • anti-trespass panels

GRP fencing, gates
and anti-trespass panels.

Define the boundary. Design the access.

GRP fence runs, gate bays and anti-trespass panels for rail, utilities and industrial sites. Bring the boundary, supporting structure and maintenance route into one coordinated package.

A boundary is a complete assembly

Panels, access and support.
Connected by the detail.

Illustrative fence and gate arrangement. Final geometry, thresholds and connections are developed for the site.

Fence panels

Choose mesh, solid or palisade-style infill against visibility, access deterrence, privacy and exposure. Panel format changes wind loading and the interfaces with posts and rails.

Authorised access

Locate gates from the maintenance task. Agree clear opening, swing, lock management and the route for tools or equipment. Resolve thresholds and ground levels at the same time.

Posts and support

Transfer panel and gate forces through posts, brackets and foundations into a suitable substrate. Record the existing concrete, steelwork or ground conditions before selecting fixings.

Select by the job it must do

Separate the boundary
from the deterrent surface.

Perimeter fence and gates

For compounds, process areas and restricted maintenance zones. Develop the height, infill, post spacing and entry points around the site risk and operator’s requirements. Include corners, changes in level and interfaces with existing fencing.

Electrical-break sections

A GRP bay or gate can form part of an engineered proposal to interrupt a metallic fence run. The electrical designer defines the required arrangement, including all adjacent metalwork and connections.

Ground-level anti-trespass panels

Profiled deterrent panels can help discourage entry at selected rail and infrastructure interfaces. These are not pedestrian flooring. Keep authorised walking, inspection and emergency routes clearly separated and resolve drainage and supporting details.

Bespoke retrofit infill

Fill awkward gaps around retained structures or renew a deteriorated section. Survey the actual opening and connection points; avoid leaving climb-around routes or transferring new forces into unverified existing members.

Survey before fabrication

Follow the fence line.
Check every change.

Record the run in plan and elevation. Include height, levels, corners, gate positions, buried-service constraints and the relationship to adjacent roads, tracks, equipment and walkways.

Retained structure and new foundations

Check concrete condition, available bearing, edge distances and access for drilling. Where posts are ground-supported, confirm ground information and foundation scope. Existing metal posts or walls need their condition and proposed additional duty reviewed.

Fixings and installation access

Select anchors, brackets and connection materials for the substrate and exposure. If pull testing is needed, agree the test plan and acceptance criteria with the responsible designer. Include isolation, permits, possession windows and safe access for installation.

Arrange a measured survey →
Fence survey informationRun length + bay referencesGate swingCorner + change in levelSubstrate + fixing locations
Survey diagram only. Record dimensions and levels on the project drawing.

Include the exposure.

Wind, coastal salts, process chemicals, washdown and temperature affect material and connection selection. Identify fire requirements, expected impact and any specialist security specification at enquiry stage.

Make the electrical intent explicit

A GRP section.
A coordinated electrical detail.

Define the required separation

Provide the asset owner’s electrical specification and the reason for the break. Review fence continuity, adjoining gates, buried conductors and nearby accessible metalwork. The required length and arrangement come from the electrical design, not from a standard illustration.

Check the complete connection

Metallic bolts, hinges, locks, reinforcement and retained posts can affect the intended arrangement. Specify and inspect the whole assembly. A GRP material description alone does not establish an electrical insulation rating or prove that touch and transferred-potential risks are controlled.

For substations, rail and other sensitive sites, bring the responsible electrical designer and asset-owner requirements into the brief early.

Discuss electrical interfaces →

Technical basis for the selected arrangement

Specify the performance.
Ask for the matching evidence.

Wind and structural actions

Agree the applicable edition of BS EN 1991-1-4 and UK National Annex where used. Site exposure, panel solidity, height and gate condition inform the actions on panels, posts, connections and foundations.

Fence and security requirements

The BS 1722 series covers defined fence types. Identify the applicable specification and evidence for the proposed GRP system; do not assume a steel-fence part certifies a composite alternative. State any required security rating separately.

Rail assurance route

Network Rail guidance identifies boundary fencing among uncontrolled items. Confirm the route for the actual product and location, particularly anti-trespass equipment. Applicable civils and asset-owner requirements still need to be met.

Prepared for the site sequence

Build the package
around the installation window.

Survey and schedule

Agree fence runs, bay references, gates and retained interfaces. Compare GRP and metal proposals against the same access function, environmental conditions and maintenance scope rather than assuming a fixed cost or carbon saving.

Fabricate and identify

Panels and profiles can be cut, drilled and labelled by run, elevation or phase. Align fixing packs and drawings with the contractor’s sequence. Choose supply-only, survey and supply, or an installation package.

Inspect and maintain

Check post alignment, fixings, panel retention and gate operation against the accepted detail. Hand over drawings, materials, lock arrangements and inspection needs. Recheck impact damage, loose connections and changes around the boundary.

Prepare a GRP fencing quotation by run and gate.

Fence length alone does not define the package. Use a marked-up plan to separate new fence runs, replacement bays, gates and ground-level anti-trespass panels, then identify the design and installation responsibilities.

Compound and perimeter fencing

State height, run length, corners, level changes, panel format and gate openings. Include foundations or retained supports, delivery access and the exposure conditions. Confirm whether the quotation covers materials, fabrication or an installed system.

Rail and electrical interfaces

Provide the asset-owner specification and the purpose of each boundary section. Distinguish access deterrence from electrical separation and agree the responsible design and assurance routes. A GRP fence description alone does not establish approval or an electrical rating.

Replacement bays and phased work

Identify the retained fence, existing connections and how the boundary will remain controlled during changeover. Agree temporary protection, removal and disposal responsibilities, site access and the release sequence before fabricating the replacement bays.

What changes the installed cost?

Height, panel solidity, gate size, post and foundation requirements, fixing access and permitted working hours all affect the quotation. Compare like-for-like scope and confirm current material availability. Use the existing fencing enquiry brief to record the known details and mark anything still requiring survey.

Send your drawings and supply requirements →

Questions before the fence is specified.

Can GRP fencing join an existing steel fence?

Yes, a retrofit interface can be developed from a survey. Agree the connection forces, condition of retained members and any electrical-break intent before fixing the new section.

Can anti-trespass panels be used as a walkway?

No. A deterrent surface serves a different purpose from a safe walking route. Keep authorised access separate and select appropriate grating or a walkway for maintenance.

Are different colours and resin systems available?

Discuss the available resin, colour and finish for the environment and asset-owner specification. Confirm chemical, UV and fire requirements for the selected material; a colour is not a performance classification.

What do you need for a quotation?

Send a marked-up fence plan, approximate height, photographs, substrate details and gate requirements. Include electrical or security specifications and whether you need supply, fabrication or installation support.

Save the boundary requirement

Send the fence line.
Get a defined proposal.

Download the fillable enquiry brief, record the known dimensions and save a copy. Attach plans, photographs and the relevant specifications, then send the package to Kev or Ashleigh.

The PDF does not submit information. Save the completed file before attaching it to your enquiry.

Vital project information pack

Include the decisions still open.

Fence height, run length, gate locations, support conditions and operating access. Mark unknown dimensions for survey and identify who owns the electrical or security design.

Coordinate drawings and design information →

Request technical evidence →

Technical project enquiry

Send the drawings.Show us the constraint.

Share whatever is available. A finished specification is not required; photographs, marked-up PDFs and partial dimensions can all help us identify the next responsible step.

  • Up to five drawings or photographs
  • Project and technical enquiries
  • Reviewed by the Vital GRP team

Tell us what you know

← Back

Thank you. Your enquiry has been received.

The Vital GRP team will review the information you have sent and contact you about the next step. For a time-critical requirement, call 01206 396446. Keep a copy of your drawings and brief for reference.

Drag and drop or click to select up to 5 files, maximum 20 MB per file. Use PDF drawings, JPG or PNG photographs, or Word documents. For DWG, IFC or larger files, contact the team to agree a transfer method. You can send an enquiry without attachments.

Your files are used to review and respond to this enquiry. Open the full contact page.