+44 (0)1206 396446 Call +44 (0)1206 396446

Oil & gas → / GRP Access for Onshore Oil & Gas →

GRP pump & separator
maintenance platforms.

Reach operating and maintenance points without compromising equipment removal.

Develop the layout, supporting structure and installation scope with Vital, using the actual asset and operating requirements.

Illustrative pump and separator maintenance platform
Illustrative access arrangement — not a project photograph or construction design.

Start with the work

Reach operating and maintenance points without compromising equipment removal.

A pump platform must do more than provide a place to stand. Establish whether the task is a daily inspection, valve operation, seal change or a larger maintenance intervention. The equipment position and the task determine platform level, usable width and where access should arrive.

Resolve the interfaces early.

Separator access can need several working positions around one vessel. Plan the route between them and retain access to manways, drains and instrumentation. Removable deck zones may help with service access, but their support and restraint need to be defined from the start.

Avoid placing a new support where it blocks a maintenance withdrawal route or interferes with existing services. A coordinated survey combines the access geometry with the equipment manufacturer’s maintenance envelope and the condition of the surrounding structure.

Engineering inputs

Make the requirement
specific to your asset.

These are the decisions that shape this application. Mark unknowns on the enquiry rather than substituting assumed dimensions or capacities.

Operating envelope

Mark valves, inspection ports and service positions at their actual levels.

Maintenance loads

Include people, tools, removable components and any temporary working loads.

Equipment removal

Show motor withdrawal, vessel access and lifting clearances.

Support arrangement

Locate plinths, slab edges and retained steel; separate access loads from equipment supports.

Fabricated GRP platform and stair assembly being loaded for the SUEZ Southend project.
Genuine SUEZ Southend project photograph: a separate waste and recycling access package, shown as a fabrication reference.

From the project library

Plan fabrication and handling together.

The SUEZ Southend record shows fabricated platform and stair assemblies prepared for transport. For a pump or separator package, the useful question is how the proposed assembly will reach its final position while retaining equipment-removal space.

Identify delivery access, lifting points to be designed, the largest transportable assembly and any joints needed for site assembly. Confirm the operating site’s material and acceptance requirements separately.

See the SUEZ project record →

A coordinated package

Define what is included.
Keep the interfaces clear.

Tell us whether the requirement is supply, fabrication or an installed assembly. Identify retained structures and work by other trades so survey, design and installation responsibilities can be agreed.

  • Arrangement and levels, including supports and access boundaries.
  • Panel layout, penetrations, restraint and removable components.
  • Handling, installation sequence and the information required at handover.

Evidence for this location

For hazardous areas, the site team’s DSEAR assessment and area classification inform the material and installation requirements. COMAH duties may also apply to the establishment. Neither is a blanket product approval for GRP.

HSE guidance on DSEAR →

The project specification governs the required standards, test evidence and acceptance criteria. Product selection follows the defined loads, exposure and interfaces.

Complete design-input guide →

Move this application forward

Send the working details.
Start the engineering review.

Include a marked layout and site photographs, plus the available information below. State the target delivery or shutdown window and the support you need.

  • Operating envelope: Mark valves, inspection ports and service positions at their actual levels.
  • Maintenance loads: Include people, tools, removable components and any temporary working loads.
  • Equipment removal: Show motor withdrawal, vessel access and lifting clearances.

Technical project enquiry

Send the drawings.Show us the constraint.

Share whatever is available. A finished specification is not required; photographs, marked-up PDFs and partial dimensions can all help us identify the next responsible step.

  • Up to five drawings or photographs
  • Project and technical enquiries
  • Reviewed by the Vital GRP team

Tell us what you know

← Back

Thank you. Your enquiry has been received.

The Vital GRP team will review the information you have sent and contact you about the next step. For a time-critical requirement, call 01206 396446. Keep a copy of your drawings and brief for reference. There is no need to send the same enquiry again. If you need to add anything, please contact the team and mention your project.

Drag and drop or click to select up to 5 files, maximum 20 MB per file. Use PDF drawings, JPG or PNG photographs, or Word documents. For DWG, IFC or larger files, contact the team to agree a transfer method. You can send an enquiry without attachments.

Your files are used to review and respond to this enquiry. Open the full contact page.