+44 (0)1206 396446 Call +44 (0)1206 396446

Oil & gas → / GRP Access for Onshore Oil & Gas

Onshore GRP access.
Built around the plant.

Bring pumps, separators, tanks and service routes into one coordinated access plan. Vital develops GRP platforms, walkways and crossings around the operating task, the supporting structure and the conditions at your facility.

Locate your requirement

Choose an area.
Explore the access solution.

Hover over a numbered marker to see the area name, or select it to open the application. On a phone, tap a marker or choose the same numbered area from the list below.

Illustrative application map, not a project photograph or construction design. Markers show access opportunities; product suitability is determined for the actual location.

Define the interfaces.
Then develop the system.

An onshore access package often connects assets installed at different times. The route must work around pipework, bund walls, cable routes and equipment-removal spaces. Survey those interfaces before selecting panel spans or fixing positions.

Working positions

Show the valves, instruments and maintenance points people must reach. Include tools, parts and the clear area needed to work.

Supports and fixings

Identify the slab, plinths or retained steelwork. Confirm condition, bearing, anchor selection and any project-specific pull-test requirements.

Exposure and drainage

Record chemicals, concentrations, temperature, cleaning fluids and standing water. Coordinate the route with drainage and bund containment.

Installation window

Agree isolations, delivery access, lifting limits and whether the assembly needs to arrive as identified modules.

Evidence for the actual location

Match the specification
to the operating conditions.

For hazardous areas, the site team’s DSEAR assessment and area classification inform the material and installation requirements. COMAH duties may also apply to the establishment. Neither is a blanket product approval for GRP.

HSE guidance on DSEAR →

Bring the applicable requirements

Include the asset-owner specification, loading and deflection criteria, exposure information and required acceptance records. Where access standards are specified, identify the edition and the parts relevant to the assembly.

Agree the evidence for panels, supports, connections and guarding together. Keep product data linked to the installed arrangement.

Technical assurance →

Coordinate the package.
Plan the installation.

New platforms can be coordinated with prepared concrete and planned service routes. Refurbishment needs a different starting point: retained steelwork, uncertain substrates, operational restrictions and a safe sequence for removing the old floor.

Capture the asset

Combine drawings with a verified survey of supports, services and access. Record assumptions before dimensions are released.

Survey support →

Resolve the assembly

Coordinate panel boundaries, connections, guarding and removable areas. Agree the drawing revision and module sizes before fabrication.

Design coordination →

Release for use

Plan installation, inspection and handover. Record the permitted use, retained interfaces and any outstanding items.

Operating-site installation →

Explore the working area

Take the next design decision.

Illustrative Pump & Separator Maintenance Platforms

Pump & Separator Maintenance Platforms

Reach operating and maintenance points without compromising equipment removal.

Explore the application →

Connected system choices

Develop the complete access arrangement.

Platforms & walkways

Explore the system options and the information needed to define the assembly.

Platforms & walkways →

Stairs & landings

Explore the system options and the information needed to define the assembly.

Stairs & landings →

Before you specify.

Can we replace only part of an existing steel walkway?

Yes, the package can be scoped around a defined replacement area. Survey its boundaries, check the retained support structure and agree how adjacent access remains managed during the work.

Does the platform need separate foundations?

That depends on the loads and available structure. Record whether it will bear on existing concrete, new bases, steelwork or ground; the foundation and connection design follows from those inputs.

Start with your asset

Send your drawings.
Define the access package.

Send a marked-up plant layout, photographs of the support structure and the tasks to be carried out. We can then discuss the access arrangement, survey gaps and fabrication or installation scope.

Technical project enquiry

Send the drawings.Show us the constraint.

Share whatever is available. A finished specification is not required; photographs, marked-up PDFs and partial dimensions can all help us identify the next responsible step.

  • Up to five drawings or photographs
  • Project and technical enquiries
  • Reviewed by the Vital GRP team

Tell us what you know

← Back

Thank you. Your enquiry has been received.

The Vital GRP team will review the information you have sent and contact you about the next step. For a time-critical requirement, call 01206 396446. Keep a copy of your drawings and brief for reference. There is no need to send the same enquiry again. If you need to add anything, please contact the team and mention your project.

Drag and drop or click to select up to 5 files, maximum 20 MB per file. Use PDF drawings, JPG or PNG photographs, or Word documents. For DWG, IFC or larger files, contact the team to agree a transfer method. You can send an enquiry without attachments.

Your files are used to review and respond to this enquiry. Open the full contact page.