Vital GRP project case study
Oasis Academy Bristol RiserDeck® Riser Protection
Permanent GRP riser-floor protection coordinated around modern building-services requirements.

01 · Challenge
Treat the service riser as a permanent engineered interface.
Service risers combine multiple trades, penetrations and construction stages in a confined area. The Oasis Academy project used RiserDeck® to provide permanent GRP riser-floor protection rather than relying solely on temporary coverings and later secondary work.
02 · Engineering response
Coordinate the floor around structure, services and access.
RiserDeck® can be engineered around riser dimensions, service penetrations, loading and access requirements. The standard design basis is developed around a minimum 5 kN/m² UDL, subject to project-specific engineering and opening geometry.
Where the specified system requires it, RiserDeck® can be supplied with Class B reaction-to-fire performance to EN 13501-1. The fire resistance of the overall shaft remains dependent on the complete shaft construction, fire stopping, walls, doors and interfaces.
03 · Delivery and application
Permanent protection can simplify the construction sequence.
Factory-prepared GRP components reduce site cutting and can lower handling demand compared with heavier steel arrangements. Early coordination also helps align the riser floor with MEP installation rather than treating it as a late-stage obstacle.
04 · Outcome
A durable riser floor that remains part of the finished building.
RiserDeck® turns the riser opening into a permanent coordinated access and protection system, supporting future maintenance while reducing corrosion risk and repeated temporary-work activity.
Planning a similar project?
Designing a service riser?
Send the riser drawings, loading requirements and MEP penetrations before services are fixed. We can review the opening and develop the appropriate RiserDeck® arrangement.