A replacement trench cover starts with the site, not just a panel. At Oxford Brookes University, Willmott Dixon required a replacement for an existing concrete trench cover. Vital GRP supplied and installed the new GRP solution. These are photographs of the completed project. For your own scheme, the opening, supporting structure, required loads and maintenance access all need to be understood together. Send us your drawings and site photographs to begin the conversation. Vital GRP. Practical project experience, applied to your requirements.
Project sheet: download the illustrated case study with its linked project film.
01 · Challenge
Replace heavy covers without extending the programme.
The existing concrete trench-cover arrangement within Oxford Brookes University’s engineering facilities was no longer fit for purpose. Willmott Dixon required a durable replacement that improved handling and surface safety while limiting disruption to the surrounding university environment.
The installation had to be completed within the available one-day programme and respond to unforeseen site conditions without allowing those issues to delay handover.

02 · Specification
Lighter panels with a gritted walking surface.
Lightweight covers
The GRP panel system reduced individual handling weight compared with the former concrete covers.
Anti-slip surface
A durable gritted finish provided a clearly defined walking surface across the covered trench.
Site resolution
The delivery team responded to installation issues at the workface and maintained the agreed one-day programme.

03 · Delivery
Resolve site issues within the one-day installation.
Vital GRP team members Lee Curle, Simonas Sedlauskas and Kim Hollick carried out the supply-and-install package. The documented project record notes that unforeseen installation challenges were resolved promptly and the work was completed on time and to specification. Willmott Dixon subsequently recognised the high standard of the delivered work.

04 · Outcome
A durable, easier-to-handle trench-cover route.
The engineering facility received a modern, durable trench-cover surface that is easier to handle and was installed without extending the agreed programme.
Standards and assurance: Project-specific cover layout, anti-slip surface and installation quality controls.
Evidence note: Published Vital GRP project asset and completed-site photography. Client feedback is paraphrased rather than presented as an unsupported direct quotation.

Planning a similar project?
Could GRP improve your trench-cover arrangement?
Handling weight, surface finish and the installation window all affect the choice of replacement cover.
Send the trench layout, opening dimensions, loading and access requirements. We can help define a suitable cover package.
Discuss a trench-cover upgrade