GRP open-mesh fire test evidence

A clear account of the historical indicative test, its sample and limitations, with a route to the evidence needed for your specification.

Identify the original report.

Report
2502443/02/09
Report date
26 March 2009
Laboratory
BCTC / BTTG Testing & Certification Ltd
Sample description
GRP open-mesh floor grating sample
Recorded test date
6 March 2009

Indicative evidence, with a defined scope.

The report describes tests to BS EN ISO 11925-2:2002 and BS EN ISO 9239-1:2002. Both test sections are marked indicative. The closing statement indicates Bfl-s1 for the supplied sample under the stated test conditions; it does not establish an absolute classification.

The report explicitly records reduced specimen numbers. It states that results from three specimens are used to determine an absolute class. The specimen was tested with supporting substrates, so the result must not be transferred automatically to an open riser void or another installation arrangement.

Request the evidence for the proposed product.

The source sample description does not establish a current product designation or resin match. A current specification needs the exact product, applicable classification evidence and end-use conditions confirmed together.

What the review needs to resolve.

Product identity

Match resin, geometry, thickness and surface to the test and classification documents. A generic GRP description is not a product match.

Installation conditions

Check the substrate and mounting conditions against the proposed assembly. The report contains differing substrate descriptions that require clarification before design use.

Required performance

Keep reaction to fire separate from structural capacity, fire resistance and compartmentation. Agree the project requirement with the responsible designer.

Questions about the fire record.

Can this be presented as a full Bfl-s1 classification?

No. The report is explicit that its result is indicative, with reduced specimen numbers. This page does not upgrade that historical result into an absolute or current classification.

Does the test prove that a RiserDeck® floor provides fire compartmentation?

No. Reaction-to-fire testing of a flooring sample does not establish the fire resistance or compartmentation performance of a complete riser assembly.

What should I request for my specification?

Provide the proposed product and installation, required fire performance and project context. Request the complete applicable test and classification records, including mounting and substrate conditions, for technical review.

Bring the evidence into your project review.

Illustrative Vital project document pack

Tell us the product or system, project reference and the decision you need to support. Include a drawing revision or specification where available.

We can identify the relevant company, product and project records for your enquiry.

Apply the evidence to the project

Check whether the tested configuration matches the proposed use.

Use the GRP Fire Performance Selector to compare the project requirement with the available product evidence, including reaction-to-fire classification and the tested end-use configuration. A test summary does not by itself establish suitability for a different product or installation.

Open Fire Performance Selector →

Technical project enquiry

Send the drawings.Show us the constraint.

Share whatever is available. A finished specification is not required; photographs, marked-up PDFs and partial dimensions can all help us identify the next responsible step.

  • Up to five drawings or photographs
  • Project and technical enquiries
  • Reviewed by the Vital GRP team

Tell us what you know

← Back

Thank you. Your enquiry has been received.

The Vital GRP team will review the information you have sent and contact you about the next step. For a time-critical requirement, call 01206 396446. Keep a copy of your drawings and brief for reference. There is no need to send the same enquiry again. If you need to add anything, please contact the team and mention your project.

Drag and drop or click to select up to 5 files, maximum 20 MB per file. Use PDF drawings, JPG or PNG photographs, or Word documents. For DWG, IFC or larger files, contact the team to agree a transfer method. You can send an enquiry without attachments.

Your files are used to review and respond to this enquiry. Open the full contact page.