Vital GRP how-to video
How to Plan GRP Access Around Live Plant
Watch the 2 minute 31 second guide. Read the episode transcript below.
Read the episode transcript
Planning GRP access around live plant starts with the maintenance task, not with a catalogue platform. Define the user, task, tools, frequency, working position and clearances. Survey equipment envelopes, services, hazards, levels and roof or floor build-ups. Protect plant maintenance zones, lifting routes, escape routes and future replacement access. Coordinate width, headroom, changes in level, landings, gates, guarding and transitions. Verify the receiving structure, bearing points, foundations, roof interfaces and ties to existing work. Plan delivery, storage, temporary access, isolation, permits, lifting and working-at-height controls. At St Albans Hospital, Vital supplied and installed a GRP platform with stair amendments, a ships ladder and SafeClamp handrail, with later work coordinating an extension, moved access steps, changing levels and roof interfaces. Close with approved drawings, RAMS, inspection points and an as-built record. Submit the survey, task, clearances, loads and receiving-structure details to Vital GRP for technical review.
About this video
Vital GRP guidance on how to plan grp access around live plant.
Read the full technical guide →

Leave a Reply