Oil & gas → / GRP Access Systems for Refineries →
Refinery drainage
& trench covers.
Preserve drainage and inspection access within a defined loading arrangement.
Develop the layout, supporting structure and installation scope with Vital, using the actual asset and operating requirements.

Start with the work
Preserve drainage and inspection access within a defined loading arrangement.
A trench-cover package has to work as an access surface and as part of the service infrastructure. Establish who or what will cross it, how often it must be opened and which parts need to remain removable. Pedestrian use must not be assumed where vehicle movements are possible.
Resolve the interfaces early.
The condition of the trench edge is part of the design. Survey bearings, level changes and deterioration so repairs or new support details can be included. Coordinate the cover arrangement with drainage and any services inside the opening.
For removable panels, consider handling and secure reinstatement from the start. Clear identification and an agreed lifting method support maintenance use. The enquiry should distinguish the proposed cover assembly from any separate containment, sealing or drainage design responsibilities.
Engineering inputs
Make the requirement
specific to your asset.
These are the decisions that shape this application. Mark unknowns on the enquiry rather than substituting assumed dimensions or capacities.
Identify pedestrian access and any vehicle or equipment loads separately.
Survey clear openings, support ledges and damaged edges.
Maintain the required flow path and access to inspection points.
Agree removable panel sizes, lifting method, identification and reinstatement.
A coordinated package
Define what is included.
Keep the interfaces clear.
Tell us whether the requirement is supply, fabrication or an installed assembly. Identify retained structures and work by other trades so survey, design and installation responsibilities can be agreed.
- Arrangement and levels, including supports and access boundaries.
- Panel layout, penetrations, restraint and removable components.
- Handling, installation sequence and the information required at handover.
Evidence for this location
COMAH addresses major-accident hazards at relevant establishments, while DSEAR addresses risks from dangerous substances. The refinery’s site requirements must be translated into the access brief, including the material, fire and installation evidence needed for the location.
HSE guidance on COMAH →The project specification governs the required standards, test evidence and acceptance criteria. Product selection follows the defined loads, exposure and interfaces.
Complete design-input guide →Move this application forward
Send the working details.
Start the engineering review.
Include a marked layout and site photographs, plus the available information below. State the target delivery or shutdown window and the support you need.
- Use and loading: Identify pedestrian access and any vehicle or equipment loads separately.
- Opening and bearing: Survey clear openings, support ledges and damaged edges.
- Drainage function: Maintain the required flow path and access to inspection points.


