+44 (0)1206 396446 Call +44 (0)1206 396446

GRP track walkway at Edinburgh Trams

A yellow open-mesh crossing connects the routes between stabled trams, with separate panels following the track geometry.

Yellow GRP grating panels forming a pedestrian track crossing between Edinburgh Trams vehicles in the depot
Edinburgh Trams · genuine project photograph from the Vital GRP library. The full view shows the crossing panels, rails and adjacent tram positions.

A clear route across a complex track layout.

The photograph shows yellow grating sections arranged across the depot tracks, linking the hardstanding between tram positions. Each section follows the space available between the rails and surrounding surfaces. The result is a sequence of panels forming a route, rather than one uninterrupted sheet laid across the trackwork.

Visible hold-down components sit near the panel edges. Their positions are part of the recorded arrangement, but the photograph does not establish fixing sizes, support capacity or approval for another crossing. Those details belong in the current design and product schedule.

Survey the interfaces before selecting the panels.

A crossing brief should map the route from its starting point to its destination. Record track centres, rail profiles, existing surface levels, obstructions and the boundaries of each proposed panel. Identify transitions to hardstanding and any gaps that must be retained for operation, drainage or maintenance.

State whether the route is for staff on foot, staff carrying tools, trolleys or another defined use. The load case, panel aperture, support arrangement and surface transitions need to be reviewed together. A pedestrian access photograph is not evidence of vehicle capacity.

Coordinate the access with depot operations.

The trams and overhead equipment make the operational setting clear. The operator’s requirements for electrical interfaces, permitted access, track clearances and movement control must be established by the responsible team. GRP material selection does not remove those requirements.

For a new scheme, include a marked-up layout, site photographs, level survey, proposed panel-removal points and the installation constraints. Resolve the support and connection detail before releasing a final material schedule.

Explore TrackSafe® trackside walkway options for the current system range, or use rail-sector guidance to bring the project interfaces together. The grating guide helps identify the panel data required for review.

Technical project enquiry

Send the drawings.Show us the constraint.

Share whatever is available. A finished specification is not required; photographs, marked-up PDFs and partial dimensions can all help us identify the next responsible step.

  • Up to five drawings or photographs
  • Project and technical enquiries
  • Reviewed by the Vital GRP team

Tell us what you know

← Back

Thank you. Your enquiry has been received.

The Vital GRP team will review the information you have sent and contact you about the next step. For a time-critical requirement, call 01206 396446. Keep a copy of your drawings and brief for reference. There is no need to send the same enquiry again. If you need to add anything, please contact the team and mention your project.

Drag and drop or click to select up to 5 files, maximum 20 MB per file. Use PDF drawings, JPG or PNG photographs, or Word documents. For DWG, IFC or larger files, contact the team to agree a transfer method. You can send an enquiry without attachments.

Your files are used to review and respond to this enquiry. Open the full contact page.