Roof Walkway New Bond Street GRP
A roof walkway developed around pitched roof sections, a lower roof area and a change in direction. The New Bond Street installation photographs show how the GRP frame, decking and guarding come together.

Follow the route beneath the deck
The original photographs show a grey frame running beside pitched roof sections, with a return across the lower roof area. One view records open-mesh panels fitted to part of the route; other views show the frame before the deck is installed.
That sequence makes the hidden interfaces visible: cross-members beneath panel edges, bolted frame connections, upright positions and discrete support bases at roof level. The panel schedule is only one part of the access arrangement.
Challenge
The photographed route occupies a constrained space between existing roof slopes and surrounding building fabric. The frame changes direction and level, so setting out the clear route and the transitions matters alongside selecting the walking surface. The photographs provide the project context; they do not establish a load rating or prove the capacity of the roof beneath.
Specification
The project record shows open-mesh decking, a supporting frame, bolted connections and perimeter rails at different stages of assembly. For a similar requirement, define the finished deck width, panel boundaries, support positions, guarding and access points on the drawing before releasing a cutting schedule.
Installation
The views below show the frame and upright layout before the full deck and rail arrangement is fitted. Check the roof support and waterproofing detail with the responsible parties; visible bases in a photograph do not establish an approved attachment method for another roof.


What to take into your roof-access brief
Mark the route, changes in level, rooflights, drainage, equipment clearances and access points on a roof plan. Keep the building support and waterproofing duties explicit, then coordinate the frame, deck and guarding with those constraints.
Fixing reference: VGRP-DS-14 distinguishes an M-clip used to hold down open-mesh grating from a G-clamp used for non-structural panel-to-panel joining. Neither description establishes a roof attachment or the capacity of the complete walkway. Specify each connection for its actual role.
The retained photographs document installation stages. Final acceptance should be based on the agreed design and completion records, with all decking, guarding and fixings checked before use.