A clear route above crowded deck services.
The vessel was in dry dock for refit with a deck crowded by pipes, conduits and other services. The client needed a defined pedestrian and maintenance route that protected both the crew and the equipment beneath it.
Site-access restrictions prevented the delivery team from carrying out the surveys directly. The client captured the existing condition while the GRP structure was coordinated remotely against the vessel’s digital model.
02 · Specification
Grating, supports and handrails as one system.
Model coordination
Three-dimensional gantry designs were integrated into the vessel model to identify clashes before fabrication.
Complete access route
Open-mesh anti-slip grating, structural profiles and handrails formed one raised system above the services.
Marine material
GRP grating, profiles and handrails were coordinated as an assembly. Material selection, connections and the vessel interface belong in the same project review.
03 · Delivery
Remote coordination, followed by rapid installation.
The project account records a 13-month collaboration. The structure was prefabricated at Brantham in Suffolk and divided into manageable assemblies for delivery. Installation on the vessel was completed in six days.
04 · Outcome
A raised access route across the working deck.
A raised walking route provided access above the deck services, combining grating, structural profiles and handrails. The project account records six days for installation.
Project record: Vital Case Studies. Vessel identity remains confidential.
For a comparable installation: confirm access loads, slip performance, restraint, vessel interfaces and any fire or electrical requirements against the specified assembly and its supporting evidence.
Project delivery
From survey to installation.
Client survey information supported remote model coordination, followed by prefabrication and installation.
Recorded project workflow
- Client surveyExisting deck geometry and service information
- Model coordinationGRP gantry designs integrated with the vessel model
- PrefabricationAssemblies prepared at Brantham, Suffolk
- InstallationSix-day installation recorded on the vessel
Planning a similar project?
Could a raised walkway solve your deck-access problem?
Where pipes and equipment restrict movement, a coordinated raised route can provide access above the services.
Send the deck layout, survey information, access duty and vessel-interface requirements. We can help coordinate the grating, supports, guarding and installation sequence.
Discuss a marine access project