Maintenance Platform Koko GRP Access
A practical GRP solution for compact equipment maintenance.
Previous team experience: This project was delivered by members of our team in their previous employment. It is presented here as their previous project experience.


Suspended GRP access in a listed building
The original KOKO Camden project record describes an 11-metre suspended access platform within the venue’s redevelopment. Maintenance access was needed to storage tanks in the space beneath the listed roof. Restrictions on fixing to the walls shaped the solution: the platform was suspended using drop rods.
Working within a constrained roof space
The installation team created a multi-level walkway over a two-week installation period. The project record describes an arrangement that avoided placing weight on the internal roof and limited interference with the listed structure. Lightweight composite components helped the team manoeuvre materials within the restricted working space.
The documented specification included QuartzGrip® open mesh GRP grating and a SafeRail™ GRP handrail system. These are the products recorded for the original installation; a new project needs its own specification, support design and loading assessment.
Planning a similar maintenance-access project
For a comparable installation, share photographs, the equipment locations, available headroom, proposed access route and any restrictions on fixing to the building. Identify who can confirm the supporting structure and required loads. These details help define the survey and engineering work before a fabrication or installation quotation is prepared.
A suspended arrangement is specific to its supporting structure. The KOKO example illustrates how building constraints can shape the access solution; its dimensions and fixing approach should not be copied to another site without project-specific design.
