+44 (0)1206 396446 Call +44 (0)1206 396446

Vital GRP project case study

Hindlow Sidings TrackSafe® TS-50 Rail Walkway

A low-level modular GRP walking route for permanent trackside access around the Hindlow and Brigg’s Sidings infrastructure.

RailTrackSafe® TS-50Trackside walkway
Yellow TrackSafe grating walkway with grey handrails running beside an existing building
Comparable TrackSafe installation — Scottish Woodland (TS-150). Representative system image, not the Hindlow TS-50 configuration. View the photographed project.
SectorRail
LocationHindlow / Brigg’s Sidings, Buxton
SystemTrackSafe® TS-50 walkway
ClientRail infrastructure project

01 · Challenge

Replace informal trackside access with a defined walking route.

Trackside maintenance routes can involve ballast, mud, vegetation, standing water and uneven ground. A permanent walkway provides a consistent pedestrian surface and makes the intended access route immediately clear.

02 · Engineering response

Use the low-level TrackSafe® TS-50 configuration.

The TS-50 system uses a 50 mm GRP box-section support frame with 38 mm mesh flooring and is designed for low-level trackside access. The published design basis includes a 5 kN/m² safe working load, subject to project-specific design and interfaces.

QuartzGrip® anti-slip surfaces and SafeClamp® edge protection can be integrated where the route requires them.

03 · Delivery and application

Modular construction reduces installation complexity.

TrackSafe® components are lightweight and modular, reducing the need for heavy lifting and extensive site fabrication. The system can be installed on hard standing or configured for softer ground conditions depending on the route design.

04 · Outcome

A clear, corrosion-resistant route through the rail environment.

The result is a permanent pedestrian route that avoids the corrosion and routine painting associated with steel and provides more predictable footing than an informal ballast path.

Planning a similar project?

Need a permanent trackside walkway?

Send the route length, width, ground condition and photographs. We can review whether TS-50 or another TrackSafe® configuration is appropriate.

Discuss a TrackSafe® Route

Technical project enquiry

Send the drawings.Show us the constraint.

Share whatever is available. A finished specification is not required; photographs, marked-up PDFs and partial dimensions can all help us identify the next responsible step.

  • Up to five drawings or photographs
  • Project and technical enquiries
  • Reviewed by the Vital GRP team

Tell us what you know

← Back

Thank you. Your enquiry has been received.

The Vital GRP team will review the information you have sent and contact you about the next step. For a time-critical requirement, call 01206 396446. Keep a copy of your drawings and brief for reference. There is no need to send the same enquiry again. If you need to add anything, please contact the team and mention your project.

Drag and drop or click to select up to 5 files, maximum 20 MB per file. Use PDF drawings, JPG or PNG photographs, or Word documents. For DWG, IFC or larger files, contact the team to agree a transfer method. You can send an enquiry without attachments.

Your files are used to review and respond to this enquiry. Open the full contact page.