Vital GRP project case study

College Park ASHP Enclosure GRP Access Steps and Grating

A prefabricated GRP access package developed for the air-source heat-pump enclosure at College Park.

Construction and building servicesAccess steps and open-mesh gratingRooftop plant access / project planning
College Park access steps with yellow leading edges connecting to the fitted open-mesh floor.
College Park access steps with yellow leading edges connecting to the fitted open-mesh floor.
SectorConstruction and building services
LocationCollege Park School, Westminster
SystemAccess steps and open-mesh grating
ClientVital Energi

Planning a rooftop access package? Bring the plant layout, steelwork and access requirements together.

Discuss your access package

Project sheet: explore the illustrated project story.

Download PDF case study

01 · Challenge

Coordinate access around rooftop plant.

The project concerns GRP access steps and a grating floor for rooftop plant at College Park School, Garway Road, Westminster. The package connects the access level with a working surface supported by the existing steel arrangement.

The Revision B proposal distinguishes 38 mm grating treads for the access steps from approximately 66.2 m² of 50 mm open-mesh enclosure flooring. The construction drawing develops the step geometry, panel layout and fixing details. Proposal quantities describe the quoted basis, rather than an as-built measurement.

02 · Specification

Match treads, floor panels and fixing interfaces.

Prefabricated step

The step arrangement combines GRP channel framework, mid-stringer support, 38 mm grating treads and ergonomic handrail. The construction drawing develops the overall geometry and connection to the supporting structure.

Modular floor

The 50 mm open-mesh floor is set out around existing steel beams, columns and baseplates. The construction drawing identifies panels for full-width supply and site trimming around the existing interfaces.

Controlled fixing

The drawing records J-clamp and M-clip details at steel supports, with a G-clamp detail at panel joints. Fixing selection follows the actual support and joint condition.

College Park step interface and floor panels fitted around the steelwork.
College Park step interface and floor panels fitted around the steelwork.

03 · Delivery

A supply scope fitted to supporting steelwork.

The pre-start plan requires weekend delivery and coordination of the roof lifting and landing arrangements with the client. It also identifies roof loading, edge protection, access and step-foot interfaces as items to resolve before installation. The construction drawing coordinates panel cuts around steel columns and baseplates.

Project photographs show the Vital GRP team fitting the floor around the steelwork and services, with the access steps and contrasting yellow leading edges in position.

Vital GRP installer fitting open-mesh floor panels around the College Park services and supports.
Vital GRP installer fitting open-mesh floor panels around the College Park services and supports.

04 · Outcome

A defined arrangement for the plant enclosure.

The documented package combines a GRP access step, a 50 mm open-mesh floor and connection details around the existing steel support layout. The installation photographs show open-mesh flooring arranged around the steel columns and a defined stepped approach with handrails and contrasting yellow tread edges.

Standards and assurance: Project-specific layout and fixing coordination. Final support and installation requirements follow the accepted project information.
Evidence note: Project P1685; QU1079 Revision B; pre-start plan; construction drawing revision C01. These describe the proposal and coordinated scope; a completion date and as-built quantities are not stated here.

Record the step, service face and roof support together

For similar rooftop heat pump projects, show the approach level, the working side of the plant and the steelwork or other structure that receives the deck. This illustrative detail helps coordinate the access package with the equipment and roof drawings.

Axonometric diagram shows a short step approach to grating flooring on supports beside the service face of a rooftop heat pump.
Read the drawing notes
  1. Start at the access level. Record the approach and the change in level onto the working deck.
  2. Mark the service face. Confirm which side needs routine access and room for maintenance.
  3. Survey the support. Show the deck edges and supporting steelwork, plus any gaps and clashes.

Planning a similar project?

Does your rooftop plant need coordinated access?

Existing steelwork and equipment positions determine the support, tread and floor-panel arrangement.

Send the plant and steelwork drawings, levels and required maintenance routes. We can help review the supply scope and interfaces.

Discuss rooftop plant access

Technical project enquiry

Send the drawings.Show us the constraint.

Share whatever is available. A finished specification is not required; photographs, marked-up PDFs and partial dimensions can all help us identify the next responsible step.

  • Up to five drawings or photographs
  • Project and technical enquiries
  • Reviewed by the Vital GRP team

Tell us what you know

← Back

Thank you. Your enquiry has been received.

The Vital GRP team will review the information you have sent and contact you about the next step. For a time-critical requirement, call 01206 396446. Keep a copy of your drawings and brief for reference. There is no need to send the same enquiry again. If you need to add anything, please contact the team and mention your project.

Drag and drop or click to select up to 5 files, maximum 20 MB per file. Use PDF drawings, JPG or PNG photographs, or Word documents. For DWG, IFC or larger files, contact the team to agree a transfer method. You can send an enquiry without attachments.

Your files are used to review and respond to this enquiry. Open the full contact page.