+44 (0)1206 396446 Call +44 (0)1206 396446

Vital GRP project case study

Barakah Nuclear Power Plant GRP Access Infrastructure

Bespoke GRP platforms, walkways and modular handrails for safety-critical energy infrastructure in the United Arab Emirates.

Nuclear and international infrastructureAccess platforms, walkways and handrail
Barakah Nuclear Power Plant in Abu Dhabi, United Arab Emirates.
Barakah Nuclear Power Plant in Abu Dhabi, United Arab Emirates.
SectorNuclear and international infrastructure
LocationBarakah, Abu Dhabi, United Arab Emirates
SystemAccess platforms, walkways and handrail
ClientBarakah Nuclear Power Plant project

Project sheet: download the illustrated case study.

Download case study (PDF, 7.6 MB)

01 · Challenge

Durable access for demanding infrastructure.

Barakah is the United Arab Emirates’ first commercial nuclear power station. Access components serving operational and maintenance areas required dependable material performance, repeatable assembly and a delivery model suited to a major international programme.

Vital GRP supplied a coordinated package of bespoke GRP access platforms, walkway systems and modular key-clamp handrails. The lightweight composite solution reduced corrosion exposure and future maintenance compared with conventional steel access components.

02 · Specification

Platforms, walkways and modular guarding.

Bespoke geometry

Platforms and walkways were configured around the access and maintenance interfaces identified by the project team.

Modular guarding

Key-clamp handrail components created a consistent guarded route across the supplied access infrastructure.

International delivery

The package combined coordinated fabrication with a lightweight system suited to transport and assembly overseas.

Barakah Nuclear Power Plant infrastructure context.
Barakah Nuclear Power Plant infrastructure context.

03 · Delivery

A coordinated package for overseas delivery.

The work brought together GRP profiles, flooring and modular handrails as a single access-system response. Component-based fabrication supported quality control before dispatch and reduced the amount of heavy handling associated with an equivalent steel package.

Barakah site development context in the United Arab Emirates.
Barakah site development context in the United Arab Emirates.

04 · Outcome

Corrosion-resistant maintenance access.

The completed package provided corrosion-resistant pedestrian and maintenance access while extending Vital GRP’s delivery record into nuclear and international energy infrastructure.

Standards and assurance: Project-specific nuclear-site requirements, approved component specification and controlled fabrication information.
Evidence note: Vital GRP international project record, completed project. Location: Abu Dhabi, United Arab Emirates.

Planning a similar project?

Planning an international GRP access package?

Material requirements, fabrication details, transport and assembly need to be considered together.

Send the access scope, site requirements and delivery constraints. We can help coordinate the proposed package.

Discuss an international access project

Technical project enquiry

Send the drawings.Show us the constraint.

Share whatever is available. A finished specification is not required; photographs, marked-up PDFs and partial dimensions can all help us identify the next responsible step.

  • Up to five drawings or photographs
  • Project and technical enquiries
  • Reviewed by the Vital GRP team

Tell us what you know

← Back

Thank you. Your enquiry has been received.

The Vital GRP team will review the information you have sent and contact you about the next step. For a time-critical requirement, call 01206 396446. Keep a copy of your drawings and brief for reference. There is no need to send the same enquiry again. If you need to add anything, please contact the team and mention your project.

Drag and drop or click to select up to 5 files, maximum 20 MB per file. Use PDF drawings, JPG or PNG photographs, or Word documents. For DWG, IFC or larger files, contact the team to agree a transfer method. You can send an enquiry without attachments.

Your files are used to review and respond to this enquiry. Open the full contact page.