+44 (0)1206 396446 Call +44 (0)1206 396446

Products & Systems / SafeClamp® handrail

GRP handrail fittings

SafeClamp® GRP
handrail fittings.

SafeClamp® moulded connectors bring tubes, posts and mounting points into a coordinated handrail arrangement. Identify the joint geometry, then specify the fitting and its connection together.

Yellow SafeClamp® rails, elbows and mounting connections around equipment at Shenfield
Shenfield · rail intersections and mounting details within a coordinated installation.

Recognise the connection

A fitting for the geometry.
A detail for the load path.

The photographs show component forms from the SafeClamp®range. Confirm the current part designation, compatibility and installation instructions when preparing the order.

Yellow SafeClamp®three-way tube connector

Three-way

A branch or termination at a rail intersection. Coordinate the tube positions and joint orientation.

Yellow SafeClamp®four-way tube connector

Four-way

A crossing connection for intersecting tubes. Identify each rail line on the component schedule.

Yellow SafeClamp®90-degree elbow

90° elbow

A fixed change in direction. Check the return, end position and hand clearance in the layout.

Yellow SafeClamp®fixed-angle stair elbow

Stair elbow

An angled transition. Match the actual stair or ramp geometry to the selected fitting.

Yellow SafeClamp®base foot

Base foot

A mounting component at a post base. Coordinate the fixing surface, anchor layout and access.

Yellow SafeClamp®side mounting component

Side mount

An alternative mounting form. Resolve the offset, support geometry and connection forces.

The wider range includes long three-way, corner and universal connector forms. Send a marked-up layout where the angle or intersection needs a specific solution. Component photographs identify form; they do not establish a system load rating.

Specify a compatible arrangement

Start with the tube.
Resolve each intersection.

The published SafeClamp®system is based on 50 mm outside-diameter pultruded GRP tube with a 5 mm wall. Matched moulded fitting pairs close around the tube to form the joint.

InputWhat to identify
Tube and fittingConfirm the system, tube dimensions and matching fitting. Similar-looking parts are not automatically interchangeable.
Joint geometryShow straight runs, branches, corners, slopes and terminations. Record the actual angles where a fixed fitting may not suit.
Guarding dutyDefine the use, actions and movement criteria for the full arrangement. Include posts, rails, infill and supports.
Access and finishCheck hand clearance, projections, adjacent equipment and the finish at tube ends. Confirm the colour and exposure requirements.

Range reference: VGRP-DS-27, SafeClamp Handrail Systems. Request the current datasheet and matching hardware detail for the component schedule.

For the guarding design basis, use the GRP guardrail guide. Yellow is the standard colour in the published product sheet; confirm grey supply and any project-specific finish when ordering.

Connect to the actual asset

Choose the mounting.
Verify what supports it.

A base or side mount is one component in the connection. Its suitability depends on the support geometry, load transfer, substrate and fixing arrangement.

Base mounting

Show the fixing footprint and available edge distances. Coordinate the finished level, drainage and access for installation.

Side mounting

Show the bracket offset and mounting face. Include local support behaviour and any interference with the deck or equipment.

Wall termination

Identify the wall material and condition. Detail the rail termination and anchorage rather than treating the wall mount as a complete fixing specification.

Confirm any substrate investigation or testing needed for the anchor design. See Review substrate, anchor and connection design → for the information to include in the project detail.

A controlled joint detail

Make the assembly
match the drawing.

The current system sheet describes recessed A2 socket-head bolt and blind Riv-Nut connections. Use the current instructions for the selected fitting and tube combination.

Set-out and fit

Check tube lengths and fitting positions against the accepted layout. Confirm the geometry before cutting or drilling.

Holes and hardware

Use the specified hole positions, fasteners and assembly method. Keep the hardware specification with the component schedule.

Tightening and finish

Follow the required tightening procedure. Check the joint, end treatment and finished hand-contact surfaces.

Adhesives

Where bonding is specified, use the approved preparation and adhesive instructions. Do not substitute bonding for required mechanical fixings.

Inspection

Check the assembled layout, component security and support connections. Record the required inspections before the guarding is released for use.

Fixed-angle and universal fittings need to be selected within the design. Adjustability alone does not establish suitability for a particular load or installation.

Turn the layout into a clear enquiry

Send the joint locations.
Build the component schedule.

A marked-up plan and elevation are more useful than a list of fittings alone. Link each component to its position so the geometry and quantities can be reviewed together.

Layout

Include run lengths, levels, post positions, corners, slopes, openings and rail terminations.

Components

Identify tube lengths and fitting forms with quantities. Add infill, end caps and lower-edge components where required.

Connections

Show base, side and wall mounting details. Include substrate information, fixing constraints and the agreed design duty.

Vital project document pack

Keep the schedule with the layout.
Use the same drawing revision for component selection, fabrication and installation.

Questions about SafeClamp®fittings.

Can I use a fitting with any 50 mm tube?

Confirm the specified system and compatibility. Outside diameter alone does not establish that another tube or material will work with the fitting.

Are there fittings for stairs and ramps?

The range includes fixed-angle stair and universal connector forms. Provide the actual geometry so the appropriate component can be identified.

Does a base foot include the substrate fixing design?

No. The mounting component, anchors and supporting asset need to be detailed together for the project.

Can we order from a sketch?

A clear plan and elevation can start the review. Add dimensions, mounting surfaces and the intended guarding duty so the schedule can be developed.

Is the photograph a current installation instruction?

No. Photographs show component appearance. Obtain the current part and assembly information for the proposed installation.

Turn the layout
into the right components.

Send your plan, elevations and mounting details. Ask Vital to coordinate the fitting schedule with your guarding requirements.

Technical project enquiry

Send the drawings.Show us the constraint.

Share whatever is available. A finished specification is not required; photographs, marked-up PDFs and partial dimensions can all help us identify the next responsible step.

  • Up to five drawings or photographs
  • Project and technical enquiries
  • Reviewed by the Vital GRP team

Tell us what you know

← Back

Thank you. Your enquiry has been received.

The Vital GRP team will review the information you have sent and contact you about the next step. For a time-critical requirement, call 01206 396446. Keep a copy of your drawings and brief for reference. There is no need to send the same enquiry again. If you need to add anything, please contact the team and mention your project.

Drag and drop or click to select up to 5 files, maximum 20 MB per file. Use PDF drawings, JPG or PNG photographs, or Word documents. For DWG, IFC or larger files, contact the team to agree a transfer method. You can send an enquiry without attachments.

Your files are used to review and respond to this enquiry. Open the full contact page.