+44 (0)1206 396446 Call +44 (0)1206 396446

Products & Systems / GRP ladders

Bespoke GRP ship ladders

Bespoke GRP ship ladders.
Designed for the task.

Purpose-made GRP ship ladders for constrained access routes. Coordinate the rise, available space, treads, supports and landing transitions around the people who will use them.

GRP ship ladder being installed within the narrow Fan Bay underground access space
National Trust, Fan Bay · ship-ladder installation within a constrained opening.

Start with the user and the task

Compare the route.
Then choose the form.

Restricted space can make a ship ladder worth considering. Suitability still depends on access frequency, the users, tools or equipment, the surrounding hazards and the required standards.

Stair access

Review a stair where the available footprint and intended use permit it. Include movement of people, equipment and the complete approach route.

Explore GRP stairs →

Ship-ladder access

Consider a steep treaded arrangement where space is constrained. Resolve the climbing movement, hand support and transition at both ends.

Define the geometry →

Fixed-ladder access

Compare a ladder arrangement where the access assessment supports it. Include the climbing route, landing and any required protective measures.

Explore GRP ladders →

Confirm building access, public use or escape requirements separately where relevant. A compact footprint does not by itself establish a suitable access route.

Survey the complete movement envelope

Measure the rise.
Check the usable space.

A floor-to-floor height alone is not enough. Provide a plan and section through the route, including the opening and the structures or services around it.

Design inputWhat to record
Rise & footprintFinished levels, available horizontal space and the proposed direction of travel.
ClearanceOpening dimensions, headroom, adjacent walls, services and any restrictions through the climb.
Treads & widthRequired clear width and the agreed tread arrangement, spacing and surface finish.
Approach & landingThe route to each end, available standing space and the transition onto the next surface.
Users & taskFrequency of access, number of users, tools, equipment and any foreseeable emergency-access needs.
Supporting structureSubstrate, available fixing zones, edge conditions and survey information for the connection design.

Arrange site measurement and survey support →

View down the Fan Bay access shaft showing GRP ship ladder and surrounding structure
Fan Bay · the ladder, opening and surrounding structure need to be coordinated together.

The transition is part of the design

Connect the climb
to the landing.

Resolve hand support and the movement onto and off the ladder. Coordinate the top opening, adjacent guarding and any access gate with the space needed by the user.

The ladder also needs a defined load path into the supporting asset. Identify the fixing zones and check their condition before finalising the assembly.

See the National Trust Fan Bay project →

Hand support

Coordinate the handrail or handhold arrangement with the climbing movement and the approach at each end.

Opening protection

Plan guarding, gates or other controls for the landing and opening. Check operation and clearance in the intended use.

Fixings & substrate

Specify the connections for the reactions and the actual supporting material. Agree investigation or testing where needed.

Set an explicit engineering basis

Specify the assembly.
Verify the interfaces.

Bring the geometric, structural and environmental requirements into one design brief. Request the evidence that applies to the actual ladder and its connections.

Loads & serviceability

Define the design loads, user and equipment assumptions, restraint and acceptance criteria. Check treads, side members, connections and the supporting asset.

Surface & exposure

Identify moisture, contaminants, chemicals and cleaning conditions. Select the tread finish and material specification for that environment.

Material & hardware

Confirm the pultruded profile specification and connection components. GRP material selection alone does not establish electrical, fire or chemical performance.

Standard & application

For permanent machinery access, review the applicable BS EN ISO 14122 requirements. Other building or specialist applications may need a different design basis.

Drawing & schedule

Record the agreed geometry, supports, fixings, fabrication details and revision before manufacture.

ISO 14122-3:2016 addresses stairs, stepladders and guardrails within its machinery-access scope. Confirm applicability with the project team; this reference is not a blanket certification of a bespoke ladder.

Request the applicable technical information →

Plan the route to the installation point

Build for the opening.
Plan how it gets there.

Restricted access affects delivery as well as the finished ladder. Agree handling, assembly and fixing access before releasing the fabrication information.

Specify the delivery sections

Vital’s O&M record for a JAW Roofing roof-access ship ladder states that it was fabricated in two parts to assist handling. It also warns that each section has significant weight. Confirm section dimensions, actual weights and the route through doors, shafts and turns before agreeing the handling method.

Keep the connection arrangement controlled

The project manual warns against dismantling the fabrication without Vital’s instruction because this could affect ladder integrity. A designed delivery split is not permission to separate other connections. Keep the accepted drawing and assembly sequence with the installation team.

Retain inspection and alteration instructions

The same manual requires regular visual inspection and immediate reporting of damage, without setting a universal interval. Keep the accepted arrangement, connection details and alteration instructions with the asset record, alongside checks on treads and landing transitions.

Project evidence: JAW Roofing roof-access ship-ladder O&M manual, supplied and installed by Vital GRP. The Fan Bay photographs elsewhere on this page illustrate a separate project.

Plan the work and the means of access using the principles in HSE work-at-height guidance. Include competence, supervision and emergency arrangements appropriate to the task.

Complete the access route.

Vital project document pack

Show the whole route.
Send plans, sections and photographs from both ends, with the access task, dimensions and supporting structure.

Questions about GRP ship ladders.

When should a ship ladder be considered?

Where space is constrained and the access assessment supports a steep treaded route. Compare the task and users with the alternatives before choosing it.

Can it be made for a restricted shaft?

The Fan Bay project provides an example of a bespoke arrangement in a constrained opening. Your shaft dimensions, access needs and supporting structure need their own review.

What angle and tread spacing should I specify?

Agree these through the design process using the intended application, available geometry and applicable standard. Do not select them from a project photograph.

Can handrails and a landing be included?

Define the complete route in the brief so the hand support, guarding, landing and any gate can be coordinated.

Is GRP suitable for damp or corrosive locations?

Review the actual exposure against the specified profiles, tread finish and hardware. Material selection needs the environmental details.

Can this replace a conventional stair?

Only where the access assessment and applicable requirements support the change. A ship ladder is not an automatic substitute for a stair or escape route.

Bring the access problem.
Define the complete route.

Send the rise, available space and intended task. Ask Vital to review the access form, landing interfaces and fabrication scope.

Technical project enquiry

Send the drawings.Show us the constraint.

Share whatever is available. A finished specification is not required; photographs, marked-up PDFs and partial dimensions can all help us identify the next responsible step.

  • Up to five drawings or photographs
  • Project and technical enquiries
  • Reviewed by the Vital GRP team

Tell us what you know

← Back

Thank you. Your enquiry has been received.

The Vital GRP team will review the information you have sent and contact you about the next step. For a time-critical requirement, call 01206 396446. Keep a copy of your drawings and brief for reference. There is no need to send the same enquiry again. If you need to add anything, please contact the team and mention your project.

Drag and drop or click to select up to 5 files, maximum 20 MB per file. Use PDF drawings, JPG or PNG photographs, or Word documents. For DWG, IFC or larger files, contact the team to agree a transfer method. You can send an enquiry without attachments.

Your files are used to review and respond to this enquiry. Open the full contact page.